Isolation rooms for the prevention of airborne infection are an integral part of hospitals, ensuring immuno compromised patients are protected from infection and infectious patients are isolated. They are designed in accordance with the biosafety level of the pathogens they are likely to contain or isolate from.
Effective isolation rooms require careful consideration and in recent years BSRIA has assisted the Department of Health in improving their design validation practice.
[edit] New space design is helping patients’ protection
Pressure differentials isolate the rooms from the rest of the hospital. Positively pressurised rooms tend to be used to protect patients that have been immuno compromised, whereas negative isolation rooms are used to isolate an infectious patient. Air flows from a higher pressurised space into a lower pressurised space, so in positive isolation rooms, the patient is protected from infections occurring elsewhere in the hospital. In the case of negative isolation rooms, air cannot flow from the room into the hospital, therefore isolating the infection, but consideration must be given to the protection of the patient from a different infection. In recent years, new designs incorporating a Positively Pressurised Ventilated Lobby (PPVL) and neutral patient rooms have been described by the Department of Health in HBN4 (Isolation facilities for infectious patients in acute settings) and tested and validated by BSRIA.
A PPVL, set at a higher pressure than both the patient’s room and the hospital corridor, prevents air from the corridor entering the patient’s room, therefore protecting the patient, and at the same time preventing air from the room, and from a potentially infectious patient, to flow into the corridor. In addition, these rooms incorporate an “en suite” bathroom, at a negative pressure with respect to the patient’s room, ensuring all air is extracted through the “en suite” and filtered prior to release outside.
The pressure differentials in these rooms tend to be in the order of 10 Pa. Pressure differentials do not need to be as large as in other applications to ensure air flows in the desired direction. In practice, very large pressure differentials could make the doors more difficult to open and would mean higher leakage rate of potentially contaminated air in the event of poor airtightness of the room.
[edit] Good airtightness helps achieve effective isolation
Good airtightness will assist in commissioning the rooms, ensuring pressure stabilisers work properly, rooms are pressurised, and AHU are operating within the design envelope. By ensuring the structure leaks as little as possible, it is easier to achieve design pressures.
In the event of fan failure, even if it is temporary, the walls of the room constitute the first line of defence against airborne infection. Building for airtightness ensures, that in the event of fan failure, there are not-unaccounted-for flows of potentially contaminated air flowing into areas that are, in principle, risk free. E.g. in a 10 Pa pressure differential, an airtightness of 1 m³/h/m² would equate to 60 l/s of air (which is equivalent to having another door) flowing from the isolation room into other areas of the hospital, where people may not be wearing PPE. A good (low) level of airtightness is much easier to achieve if it is considered through design and the constructions stages.
[edit] BSRIA standard on Air permeability of isolation rooms (BTS3) forms part of NHS guidance HBN4
A methodology for testing the airtightness of isolation rooms has been described in BSRIA’s technical standard 'BTS 03: Air permeability of isolation rooms' and has been included in the NHS guidance to isolation rooms 'HBN4 Isolation facilities for infectious patients in acute settings'.
Nowadays, we could be talking about entire hospital wings dedicated to isolation. In this case, the PPVL and airtightness principles could be applied as well to ensure that the patients are properly isolated as well as protected.
Click here to download a copy of BSRIA's Air permeability testing of isolation facilities (BTS 3/2018) Standard.
This article was originally published on the BSRIA blog in March 2020, it was written by Dr Blanca Beato-Arribas, BSRIA Microclimate Team Leader.
--BSRIA
[edit] Related articles on Designing Buildings
- Air change rate.
- Air permeability in isolation rooms.
- Air permeability testing.
- Air permeability testing of isolation facilities.
- Air permeability.
- BSRIA articles on Designing Buildings Wiki.
- BSRIA.
- Clean indoor air for healthy living - New air filter standards.
- Coronavirus.
- Design of isolation rooms for infection control.
- Emergency healthcare architecture in Brazil.
- Indoor air quality.
Featured articles and news
A landmark moment for postmodern heritage.
A safe energy transition – ECA launches a new Charter
Practical policy actions to speed up low carbon adoption while maintaining installation safety and competency.
Frank Duffy: Researcher and Practitioner
Reflections on achievements and relevance to the wider research and practice communities.
The 2026 Compliance Landscape: Fire doors
Why 'Business as Usual' is a Liability.
Cutting construction carbon footprint by caring for soil
Is construction neglecting one of the planet’s most powerful carbon stores and one of our greatest natural climate allies.
ARCHITECTURE: How's it progressing?
Archiblogger posing questions of a historical and contextual nature.
The roofscape of Hampstead Garden Suburb
Residents, architects and roofers need to understand detailing.
Homes, landlords. tenants and the new housing standards
What will it all mean?
The Architectural Technology podcast: Where it's AT
Catch-up on the latest episodes.
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.